Optimization of the Contracted Power

Choosing a higher power than we need involves a significant overcharge in the electric bill. On the other hand, reducing it excessively can penalize us constantly and continue to be an extra cost. Optimize the electricity bill requires a technical analysis of the parameters of the same, the consumption patterns, the records of the maximeter, etc.

A study of the monthly hourly curves of at least the previous 12 months is made, to calculate the most adequate powers. With an optimization adjusted to our needs can significantly reduce the amount of the invoice.
 

 
This must be carried out even if it has been done previously although it has increased or decreased the activity in the company or to correct a possible deviation in calculating the power demanded by our activity carried out in the beginning, compared to the real.

Bobitecnic has its own software for the optimization of the contracted power, studying the turnover of the last 12 months registered, allows to adjust to the maximum the term of power and obtain in most of the cases, a significant saving.

Options

Contact Details

BOBITECNIC S.L.
Pol. Ind. Illa Sud
C/Tomàs Viladomiu nº13
08650 Sallent (Barcelona)
Spain

Tel +34 93 820 61 20
Email: mail@bobitecnic.com
We are on Google Maps

Inscribed in the Mercantile Register of Barcelona
Volume 22464, Sheet number B37477, Inscription 3.ª, N.I.F.:B58.607.227

Ir arriba