The Hydroelectric Power Plants of Caliboro and of Melo are located in the Commune of Quilleco. These are hydroelectric plants with an installed capacity of 1.3 MW and 2.8 MW respectively. Both have hydraulic circuit that consists of intake, loading chamber, discharge channel, forced pipe, Turbine and restitution channel. The Santa Isabel Hydroelectric Power Plant is located in Los Angeles with a hydroelectric power plant with an installed capacity of 1.4 MW with the same characteristics as the other two.
All the Scada system together with the electrical installations that controls the three power plants,has been commisioned and started up by Bobitecnic: